CIP 85 - Joffre / Wiggin Water Main Replacement Project

June 18, 2021 Update:

The contractor, DeFelice Corp, has completed the project to the new water main. 

All residents are restored.

General Services will begin paving on Monday June 21, 2021. 


June 10, 2020 Update

On Monday (June 14, 2021), the contractor will remove the temporary water main.  All residents will be hooked up to the new water main.  No anticipated water disruptions. Tuesday they will be working on South Main Street at Broadway to disconnect a water valve. Traffic will be reduced to alternating one way. Seek Alternative routes. The rest of the week the contractor will be focused on cleaning up the work area, reinstalling street signs and addressing punch list items. All work related to the water main project will be completed by Friday June 18, 2021.


On Monday June 21, 2021, General Services contractor, GMI will be on site to begin the reclaiming and paving of Joffre/Wiggin/South Main and Broadway Streets within the work limits of the water replacement project. This work is anticipated to be completed with base pavement the week of June 21. We appreciate the residents' cooperation and patience during this project.


June 4, 2021 Update 

The contractor will continue to install new water main services on Joffre and Wiggin Streets.

Drain and sewer services will be replaced as needed on both streets.

Traffic will be limited to local traffic only and emergency vehicles will have access.


May 28, 2021 Update:

The contractor will be repairing/replacing sewer and drain services on both Joffre and Wiggin Streets. Water services on both Joffre and Wiggin Streets will start to be connected to the new water main. This connection will require access to the homes by the contractor. Water service will be disrupted for 20-30 minutes as the new service is connected. Residents may want to run their cold water for a few minutes once reconnected to the new main if any discolored water is observed. This is not unusual and will clear up quickly.

May 21, 2021 Update:

All residents have been hooked up to temporary water on Joffre and Wiggin Streets. The contractor will complete the installation of the new 8 inch water main on Joffre St, between Donavan and Bow Streets early in the week. They will then begin to install the water main on Wiggin St. beginning at South Main Street and complete by the end of the week at Donavan St. During this work traffic will be restricted to local traffic only.